2012-02-10 Barclays Arena Vanderbilt rail yards dump truck overfilled with large rocks
2012-02-10 Barclays Arena Vanderbilt rail yards dump truck overfilled with large rocks exiting onto Atlantic Ave.
2012-02-10 Barclays Arena Vanderbilt rail yards dump truck overfilled with large rocks
2012-02-10 Barclays Arena Vanderbilt rail yards dump truck overfilled with large rocks exiting onto Atlantic Ave.
2012-02-09 Resident stumbles upon Gridlock Sam covertly testing a part of their proposed TDM plans!! (details & photo below)
2012-02-09 Resident stumbles upon FCR's consultant Gridlock Sam (using what appears to be a construction worker) covertly testing part of their proposed TDM plans for a novel mode of transportation to Barclays Arena’s but the horse & rider are traveling the wrong way EB on WB only Pacific St bet 6th Ave & Carlton Ave. Now we have an answer as to why the TDM plan has been delayed for such an extended time, extensive testing!
Immediately after Barclays Arena construction worker lunch period ends discarded beer cans remain
2012-02-08 Barclays Arena construction contractor rig again drives wrong way on a oneway street
Frantic horn honking draws residents attention because Barclays construction contractor rig drives wrong way (east bound) on oneway west bound only Pacific street!
http://www.youtube.com/watch?v=YfD6cOp-19I
2012-02-01 Barclays construction contractor rig drives wrong way on a oneway street, then reverses back to 6th Ave
2012-02-01 Barclays construction contractor rig drives wrong way (east bound) on oneway west bound only Pacific street, then the driver dangerously reverses back to 6th Ave without help from flaggers, notice how busy and blocked by double parked cars PAcific St is.
http://www.youtube.com/watch?v=9Wko8lX-CJA
Construction vehicle on Dean Street between 6th & Carlton Avenue
A backhoe travelled down Dean Street (I assume Atlantic Yards related) and then turned left on Carlton.
I also told the 311 Operator that I've seen them do this a number of times, usally in the early morning (1-3 am).
2012-01-29 Sunday Overnight construction & street closure not disclosed on last ESD Construction Alert Post 2 up to 8am
Extended overnight construction, rail yard lights & street closure not disclosed on ESD Construction Alert from 2012-01-28 11pm until 8am 2012-01-29
Nowhere in the last two-week Atlantic Yards Construction Alert, dated 1/16/12, that was distributed by Empire State Development (after preparation by developer Forest City Ratner) indicated that overnight closure of traffic lanes & staging on Atlantic Ave with all night construction with the entire bank of Vanderbilt rail yard lights on was scheduled for Saturday night (2012-01-28)
2012-01-28 Overnight construction & street closure not disclosed on last ESD Construction Alert Post 1 up to 1:30am
Extended overnight construction, rail yard lights & street closure not disclosed on ESD Construction Alert from 2012-01-28 11pm until 8am 2012-01-29
Nowhere in the last two-week Atlantic Yards Construction Alert, dated 1/16/12, that was distributed by Empire State Development (after preparation by developer Forest City Ratner) indicated that overnight closure of traffic lanes & staging on Atlantic Ave with all night construction with the entire bank of Vanderbilt rail yard lights on was scheduled for Saturday night (2012-01-28)